Set in place alongside boxing and drive metal pegs in place.
Fix screws to boxing.
Turn top and bottom handles to align brace flush with formwork.
Use screw at top to adjust Probrace up or down to ensure formwork is level.
Once concrete is poured and set, remove metal pegs.
Remove screws and braces from formwork.